Maritime Intelligence Platform

India's Inland Waterways
& River Ports

Exploring India's Rivers, National Waterways, Inland Terminals, Cargo Corridors and Maritime Connectivity

111
National Waterways
Declared under the Act, 2016
145.84 MT
Inland waterway cargo
Reported for FY 2024-25
FY 2024-25MoPSW
14,500+ km
Navigable potential
Approximate, IWAI
n.d.IWAI
1986
IWAI established
27 October 1986
1986IWAI
2016
National Waterways Act
111 waterways declared
Section 1

Introduction to Inland Waterways

Inland water transport uses natural rivers, canals, backwaters and creeks for the movement of cargo and passengers via barges, inland vessels and small ships.

River

A natural inland water route. Navigability depends on depth, channel stability and seasonal flow.

Canal

An artificial or modified navigable waterway, often connecting rivers, ports or industrial estates.

Backwater

A connected brackish water system, such as Kerala's backwaters, used for cargo and passenger transport.

Inland Terminal

A cargo transfer facility located along an inland waterway, interfacing vessels with road and rail.

River Port

A port located on or associated with a navigable river, such as Kolkata on the Hooghly.

Inland vs Maritime Transport

Inland Waterways
LocationRivers, canals, backwaters, creeks
Vessel sizeGenerally smaller barges and inland vessels
CargoBulk, regional and container cargo
NavigationDepth and channel dependent
InfrastructureRiver terminals and jetties
Maritime
LocationSeas and oceans
Vessel sizeGenerally larger ocean-going ships
CargoInternational and coastal cargo
NavigationOpen-water navigation
InfrastructureSeaports and dock complexes

India's Waterway Potential

111 National Waterways20,000+ km declared network~14,500+ km navigable potential
Section 2

India's Inland Waterway Network

India's inland waterway network spans major river systems across the country, with the Ganga-Bhagirathi-Hooghly and Brahmaputra forming the backbone of national waterways.

Major River Systems

GangaBhagirathiHooghlyBrahmaputraGodavariKrishnaMahanadiBrahmaniKerala BackwatersWest Coast Canal

Waterways with Reported Cargo

These 7 waterways are the ones for which MoPSW publishes individual tonnage in its FY 2024-25 statistics volume. India declares 111 National Waterways in total, and the remainder are either not itemised or carried no separately reported cargo.

NW-1

Ganga–Bhagirathi–Hooghly River System

India's most developed inland waterway, running from Haldia on the Hooghly estuary to Prayagraj on the Ganga, and the corridor of the Jal Marg Vikas Project.

Uttar PradeshBiharJharkhandWest Bengal
Declared length
1,620 km
n.d.MoPSW
Declared by
National Waterways Act, 2016
Dredged fairway width
45 m bottom width
Dredging Management Plan parameterIWAI
Design vessel
1,500–2,000 DWT
Project design objectiveIWAI
1,620 km
Declared length
16.38 MT
Cargo, FY 2024-25
Explore details
Lengths as officially reported
1,620 kmDeclared National Waterway lengthMoPSW
1,390 kmJal Marg Vikas Project sub-corridor, Varanasi to HaldiaIWAI
Target Navigational Depth by Stretch
Haldia – Barh3.0 mDredging Management Plan target
Barh – Ghazipur2.5 mDredging Management Plan target
Ghazipur – Varanasi2.2 mDredging Management Plan target
NW-2

Brahmaputra River

The lifeline waterway of the North-East, connecting Assam's river towns and linking to Indo-Bangladesh Protocol routes for cargo movement to and from the rest of India.

Assam
Declared length
891 km
Route
Dhubri – Sadiya
State
Assam
Navigational depth
Not separately disclosed in official sources.
Varies by stretch and season; no single official figure
891 km
Declared length
0.90 MT
Cargo, FY 2024-25
Explore details
NW-3

West Coast Canal & Kerala Backwaters

India's first waterway with round-the-clock navigation facilities, running through Kerala's backwaters and serving industrial, passenger and tourism traffic.

Kerala
Declared length
205 km
Corridor
Kottapuram – Kochi – Kollam
Connected canals
Udyogmandal and Champakara
Cargo moved, FY 2024-25
3.49 MT
FY 2024-25MoPSW
205 km
Declared length
3.49 MT
Cargo, FY 2024-25
Explore details
Lengths as officially reported
205 kmDeclared main corridor, Kottapuram to KollamMoPSW
170 kmWest Coast Canal, Kottapuram to Kozhikode, listed inside the NW-3 entryMoPSW
NW-4

Godavari–Krishna & Connected Canal System

A composite east-coast and inland system combining stretches of the Godavari and Krishna rivers with the Kakinada, Eluru, Commamur and Buckingham canals. It is the second-largest cargo-carrying waterway in the country, and development is partial.

Andhra PradeshTelanganaTamil NaduPuducherryChhattisgarhKarnatakaMaharashtra
Length
2,890 km
Composite system; see length variantsFY 2024-25MoPSW
River / canal system
Godavari, Krishna, Kakinada, Eluru, Commamur and Buckingham canals
Cargo moved, FY 2024-25
10.40 MT
FY 2024-25MoPSW
2,890 km
Declared length
10.40 MT
Cargo, FY 2024-25
Explore details
Lengths as officially reported
2,890 kmAggregate length reported for NW-4 in Statistics of Inland Water Transport 2024-25MoPSW
Component list, no single totalMoPSW List of National Waterways itemises Kakinada Canal 50, Godavari (Bhadrachalam–Rajahmundry) 171, Eluru Canal 139, Krishna (Wazirabad–Vijayawada) 157, Commamur Canal 113, North Buckingham 316, South Buckingham 110, Marakanam–Puducherry 22, Godavari (Bhadrachalam–Nashik) 1,202, Krishna (Wazirabad–Galagali) 636, East Coast Canal and Matai 256MoPSW
NW-5

East Coast Canal with Brahmani & Mahanadi Delta Rivers

An eastern system linking the East Coast Canal with the Brahmani river and the Mahanadi delta, positioned to serve Odisha's mineral and industrial belt.

OdishaWest Bengal
Length
233 km
Composite system; see length variantsFY 2024-25MoPSW
System
East Coast Canal, Brahmani, Kharsua, Dhamra and Mahanadi delta
Cargo moved, FY 2024-25
0.38 MT
FY 2024-25MoPSW
233 km
Declared length
0.38 MT
Cargo, FY 2024-25
Explore details
Lengths as officially reported
233 kmAggregate length reported for NW-5 in Statistics of Inland Water Transport 2024-25MoPSW
265 km + 67 kmBrahmani–Kharsua–Dhamra rivers and Mahanadi delta rivers, listed separatelyMoPSW
NW-16

Barak River

A regional waterway in the Barak valley of Assam, developed for inland cargo movement and connected to the Indo-Bangladesh Protocol network.

Assam
Declared length
121 km
State
Assam
Cargo moved, FY 2024-25
0.18 MT
FY 2024-25MoPSW
Permanent terminals
Badarpur and Karimganj
121 km
Declared length
0.18 MT
Cargo, FY 2024-25
Explore details
NW-97

Sunderbans Waterway

A deltaic network of tidal channels in the Sundarbans region of West Bengal, carrying the fourth-largest cargo volume among the waterways with separately reported tonnage.

West Bengal
Declared length
172 km (plus component rivers)
State
West Bengal
Cargo moved, FY 2024-25
5.98 MT
FY 2024-25MoPSW
172 km
Declared length
5.98 MT
Cargo, FY 2024-25
Explore details
Lengths as officially reported
172 kmSunderbans Waterway headline lengthMoPSW
172 km plus 13 component riversComponent lengths listed separately in the NW-97 entryMoPSW
Section 3

Inland Waterway Infrastructure

Infrastructure is what makes a declared waterway usable. From the navigation channel itself to the terminal where cargo meets road and rail, each layer enables reliable, year-round movement.

Waterway

Natural and declared river channels forming the transport corridor

Navigation Infrastructure

Fairways, buoys, beacons, and river information systems supporting safe navigation

Access & Connectivity

Jetties, loading points, and road/rail links connecting waterways to the hinterland

Cargo Handling

Storage yards, warehouses, cranes, and handling equipment supporting cargo movement

River Ports & Inland Terminals

Interfaces connecting waterways with road and rail

Navigation Channels & Fairways

  • Maintained depth channels (LAD targets by stretch)
  • Channel width and bend radius standards
  • Dredging and siltation management
  • River training works and bank protection

Buoys & Navigation Aids

  • Lateral and cardinal buoys (IALA Region A)
  • Leading lights and beacons
  • Day/night marks for channel alignment
  • River Information Services (RIS) integration

Jetties & Loading Facilities

  • Fixed and floating jetties
  • Ro-Ro ramps for roll-on/roll-off operations
  • Pontoon berths for variable water levels
  • Approach trestles and access bridges

Road & Rail Connectivity

  • Terminal access roads (NH/SH links)
  • Rail sidings and wagon loading points
  • Weighbridges and customs inspection bays
  • Last-mile connectivity to industrial clusters

Storage & Cargo-Handling Facilities

  • Covered warehouses and transit sheds
  • Open storage yards for bulk cargo
  • Container yards with stacking areas
  • Mobile cranes, conveyors, hoppers, forklifts
Section 4

River Ports & Inland Terminals

India's inland terminal network ranges from multi-modal terminals developed under JMVP to riverine major ports, each interfacing waterways with road and rail.

Inland waterway terminal — isometric layout

Schematic, not to scale. Depth, berth length and yard area are illustrative.

1234567
  1. 1Navigation channel
  2. 2Berthed cargo vessel
  3. 3Quay wall / berth face
  4. 4Gantry crane
  5. 5Container storage yard
  6. 6Transit shed / warehouse
  7. 7Road & rail interface
NW-1Multi-modal terminal (JMVP)

Varanasi Multi-Modal Terminal

Varanasi (Ramnagar), Uttar Pradesh

River: Ganga

Designed capacity
1.26 MTPA
Project design parameter, not achieved throughput
ContainersFood grainsCementFertilizers
NW-1Multi-modal terminal (JMVP)

Sahibganj Multi-Modal Terminal

Sahibganj, Jharkhand

River: Ganga

Designed capacity
2.24 MTPA
Project design parameter, not achieved throughput
Stone chipsCoalMineralsCement
NW-2River terminal and IWT hub

Pandu Terminal

Guwahati, Assam

River: Brahmaputra

Capacity
Not disclosed in official sources
ContainersFood grainsPetroleum productsOver-dimensional cargo
NW-1Maritime dock complex with inland waterway interface

Haldia Multi-Modal Terminal & Dock Complex

Haldia, West Bengal

River: Hooghly

Capacity
Not disclosed in official sources
CoalPetroleum productsContainersFertilizers
NW-1Riverine major port

Kolkata Port (Syama Prasad Mookerjee Port)

Kolkata, West Bengal

River: Hooghly

Capacity
Not disclosed in official sources
ContainersFood grainsFertilizersProject cargo
Section 5

Cargo & Commodities

India's inland waterways transport a diverse range of bulk, agricultural, liquid and containerized cargo.

Bulk
Coal
Cement
Fly ash
Iron ore
Stone
Sand
Agricultural
Rice
Wheat
Food grains
Fertilizers
Liquid
Petroleum products
Specialised liquid cargo
Container
Manufactured products
Consumer goods
Export and import containers

Cargo Flow Corridors

Coal

Coal mine→Rail or truck haul→Inland terminal→Barge on waterway→River port→Power plant or seaport

Stone chips

Quarry in the Sahibganj belt→Truck haul→Sahibganj MMT→Barge on NW-1→Downstream terminal→Construction market

Containers

Factory or inland container depot→Truck haul→Varanasi or Pandu terminal→Barge on NW-1 or NW-2→Kolkata or Haldia→Ocean vessel and export market

Food grains

Procurement centre→Rail haul→Patna or Kalughat terminal→Barge on NW-1→North-East terminal→Distribution
Section 6

Government Initiatives & Projects

India's inland waterway development is driven by institutional frameworks including IWAI, the National Waterways Act, JMVP and Sagarmala.

Development Timeline

27 Oct 1986IWAI

IWAI established

The Inland Waterways Authority of India comes into existence to develop and regulate inland waterways for shipping and navigation.

12 Apr 2016India Code

National Waterways Act

111 inland waterways are declared as National Waterways in the Schedule to the National Waterways Act, 2016, consolidating earlier declarations into a single statute.

2016 onwardIWAI

Network development

Phased feasibility studies, fairway development, terminals and navigation systems across the expanded network.

JMVPIWAI

Jal Marg Vikas Project

Capacity augmentation of the 1,390 km Varanasi to Haldia sub-corridor of NW-1 with multi-modal terminals, a navigational lock and River Information Services.

Terminal operations through PPP

IWAI hands over the Kalughat inter-modal terminal to a private operator and cargo operations commence at the Haldia multi-modal terminal, with the first consignment routed to Pandu, Guwahati.

Arth GangaNMCG

Economic development around the Ganga

A model linking waterway development with cluster-based economic activity, agriculture, tourism and riverine livelihoods.

SagarmalaSagarmala

Port-led development

Programme for port modernisation, port connectivity, port-led industrialisation and coastal community development.

IWAI — Key Responsibilities

1986Established
111 National Waterways
Fairway development and maintenance
Terminal development
Navigation and traffic management
Hydrographic survey
Dredging
Navigation aids
River Information Systems

Jal Marg Vikas Project

NW-1Ganga–Bhagirathi–Hooghly
Haldia → Varanasi: ~1,390 km
Fairway development
Multi-modal terminals
Navigational lock (Farakka)
River Information Systems
Section 7

Economic & Environmental Considerations

Inland waterways are widely described as a lower-cost, higher-capacity option for bulk cargo than road or rail. This section presents that as a directional characteristic with its limitations stated, and treats environmental performance with the same caution.

No quantification is offered here. This team could not locate a current, India-specific, methodologically harmonised dataset of freight cost or emissions per tonne-kilometre by transport mode from an official source. Rather than cite figures whose boundaries are unknown, the statements below are qualitative, and each is labelled with the caveat that applies to it.

Mode characteristics

Road
Small loads per vehicle · Fastest, flexible routing
Higher per tonne-km

Rail
Large loads per rake · Moderate, fixed alignment
Intermediate per tonne-km

Waterway
Large loads per vessel · Slowest, depth constrained
Lower per tonne-km, bulk cargo

What is actually established

  • A barge in the JMVP design class is intended for 1,500–2,000 DWT cargoes. That is a project design objective stated by IWAI, not an observed loading average.
  • Waterways suit bulk, heavy and low-value cargoes, because a single vessel can absorb a load that would otherwise need many road vehicles. The advantage is largest on long, flat, high-volume hauls and smallest on short, time-sensitive movements.
  • Inland navigation is depth- and season-constrained. Least available depth, not vessel size, sets the practical limit on what can move, which is why recurring maintenance dredging is a central cost of the model.
  • Fairway and terminal construction is itself a river and land intervention. Environmental effects have to be assessed through clearance requirements at the project level, not inferred from the choice of transport mode.

Environmental assessment

Each row states what can and cannot be claimed, and the reason.

Fuel use per tonne-km
Not quantified here
Directionally lower for bulk cargo on long inland hauls
Directionally higher

No current, India-specific, methodologically harmonised comparison was located. Do not treat this as a measured figure.

Emissions intensity
Not quantified here
Dependent on vessel type, engine and loading factor
Dependent on vehicle type, load and road condition

Absolute emissions claims require life-cycle boundaries and vessel-level data that official Indian sources do not publish.

Waterway development effects
Qualitative
Fairway dredging, bank protection and terminal construction alter riverine habitat and sediment transport
Road alignment and widening affect terrestrial habitat and drainage

Impacts are site-specific and must be assessed through environmental clearance, not inferred from mode choice alone.

Decarbonisation policy context
Qualitative
Inland vessels are within the scope of IMO shipping emissions policy
Road transport emissions are governed by separate domestic and international frameworks

This is a regulatory framing, not an emissions measurement.

Section 8

India's Inland Waterways — By the Numbers

Every figure below carries the year it refers to and the official source it comes from. Where a value is approximate or derived, that is stated rather than rounded away.

111
National Waterways
Declared under the NW Act, 2016
20,163.5 km
Declared network length
All 111 waterways combined
n.d.MoPSW
≈14,500 km
Navigable potential
Approximate, per IWAI
n.d.IWAI
145.84 MT
Inland waterway cargo
Reported for the year
FY 2024-25MoPSW
1,620 km
NW-1
Ganga–Bhagirathi–Hooghly
n.d.MoPSW
891 km
NW-2
Brahmaputra, Dhubri to Sadiya
n.d.MoPSW
205 km
NW-3
West Coast Canal
n.d.MoPSW
1,390 km
JMVP corridor
Haldia to Varanasi, within NW-1
n.d.IWAI
1986
IWAI established
27 October 1986
1986IWAI
2016
NW Act
National Waterways Act, 2016
Conclusion

From River to Port

Connecting India's Hinterland with Maritime Trade

Factory or industry→Truck or rail haulage→Inland terminal→Barge→National Waterway→River port→Maritime port connection→Ocean vessel→International market

India's inland waterways can play an important role in building a more integrated, multimodal and efficient logistics network, reducing road congestion, lowering emissions and unlocking the economic potential of the country's river systems.

Maritime Intelligence Atlas

An interactive academic presentation for the Maritime Management programme.

Subject: Introduction to Global Maritime SectorCode: SMM4124 · Group: 05
Hariharan M·Suyash Vichare·Piyush Sharma·Kaushal Prasad·Khatri Jeet·Tripurari Kumar Upadhyay