Back to overview
NW-16

Barak River

A regional waterway in the Barak valley of Assam, developed for inland cargo movement and connected to the Indo-Bangladesh Protocol network.

AssamBarak River
Key Facts
Declared length
121 km
State
Assam
Cargo moved, FY 2024-25
0.18 MT
FY 2024-25MoPSW
Permanent terminals
Badarpur and Karimganj
Route

NW-16 Route Map

Key stops along the waterway corridor.

Lakhipurcity
Badarpurterminal
Bhangaterminal
Technical

Navigational Depth

Target depths by stretch. Values are project targets, not uniform across the entire waterway.

Entire waterway
Not separately disclosed in official sources.
Varies by stretch and season
Infrastructure

Facilities & Fixtures

Navigation, cargo handling, storage and connectivity infrastructure on this waterway.

Permanent terminals at Badarpur and Karimganj
Cargo handling and storage
Road connectivity to the regional highway network
Commodities

Cargo Transported

Major commodities moved on this waterway.

Building materialsGeneral cargoPetroleum productsAgricultural produce
Development

Projects & Initiatives

Government projects and development programmes on this waterway.

Barak River development

Fairway development and terminal construction to open the Barak valley to inland cargo movement and strengthen Indo-Bangladesh Protocol connectivity.

Source
Obstacles

Challenges

Key operational and structural challenges on this waterway.

Shifting channel and seasonal depth variation
Monsoon flooding and strong currents
Limited cargo base in the region